Quality control in Vietnam works best as three planned checks against a signed sample and written spec, so problems get fixed before goods ship to Australia.

Last updated: 20 November 2026
Quality control in Vietnam works best as three planned checks: before production, during production, and before shipping. Each check compares the goods with a signed sample and a written spec (short for specification). That way, problems get fixed at the factory, not in Australia.
Here's how Australian importers can plan checks that protect a Vietnam order.
Vietnam orders need a quality plan because you can't visit often, and each factory reads specs differently. A plan turns "good quality" into checks everyone can agree on.
Written standards help the factory too. Their team knows what to aim for, and there are fewer arguments at inspection.
A quality plan is a short document that says what good looks like and how it will be checked. Share it with the factory before production starts.
Sourcing Hack: Photograph your golden sample from every angle and add the photos to the quality plan. Inspectors and factory staff can then check against the same images.
Most orders need two or three checks. The right mix depends on the product, the order size, and how well you know the factory.
For a new Vietnam supplier, book at least a factory audit and a pre-shipment inspection.
Tet, the Lunar New Year, is the biggest break in the Vietnam factory calendar. Tet 2027 falls on Saturday 6 February 2027.
A useful report tells you clearly whether the goods passed, and why. If you can't make a decision from it, it isn't detailed enough.
The factory is waiting for your decision. A fast answer keeps the ship date on track.
Free Download: Sample Factory Audit Report (Redacted)
See what a factory audit and quality inspection report covers.
Download the Sample Report ↗Hold the final payment, review the report with the factory, agree a fix, then re-inspect. A failed inspection is the system working.
To pick reliable factories, read the manufacturer red flags checklist, or get your supplier verified before you order.
It's a check of a random sample of finished, packed goods before they leave the factory, usually done before the final payment.
For a new supplier, yes. An audit confirms the factory exists and can do the job before you place an order.
Usually the buyer books and pays, so the inspector works for you rather than the factory.
AQL stands for acceptance quality limit. AQL 2.5 sets how many defects are allowed in the sample checked under a standard sampling table. It doesn't mean 2.5% of the goods can be faulty.
Tet 2027 falls on Saturday 6 February. Private employers choose their own five-day break, so factory dates vary. Get each supplier's dates in writing, and book inspections well before the break.
It's the final approved sample, signed by you and the factory. Inspectors compare production units against it.
You might reduce them over time, but a pre-shipment check is still cheap insurance on any large order.
Not on its own. Biosecurity conditions depend on the product and packaging, so check BICON for your product before you ship. Under Australian Consumer Law, the seller stays responsible for handling claims.
The seller does, and can't send the customer to the factory. If the maker has no place of business in Australia, the importer counts as the manufacturer.
Placing an order in Vietnam soon? Plan your checks before production starts.
Need help planning quality checks?
Book a free 15-minute sourcing consult with Epic Sourcing Australia.
Book a Free 15-Minute ConsultPrefer a direct link? Book your free call here.
